{"id":90,"date":"2008-08-02T23:57:16","date_gmt":"2008-08-02T21:57:16","guid":{"rendered":"http:\/\/soch.cz\/blog\/?p=90"},"modified":"2008-11-03T19:09:11","modified_gmt":"2008-11-03T17:09:11","slug":"kratke-vyvojove-cykly-sprinty","status":"publish","type":"post","link":"https:\/\/soch.cz\/blog\/management\/agile\/scrum-management\/kratke-vyvojove-cykly-sprinty\/","title":{"rendered":"Kr\u00e1tk\u00e9 v\u00fdvojov\u00e9 cykly &#8211; Sprinty"},"content":{"rendered":"<p>Pod\u00edv\u00e1te-li se na software development projekty, dost \u010d\u00e1st se V\u00e1m stane, \u017ee nejsou dostate\u010dn\u011b dob\u0159e \u010dasov\u011b odhadnuty. Samoz\u0159ejm\u011b \u010d\u00e1ste\u010dn\u011b je to d\u00e1no \u0161patn\u00fdmi odhady v\u00fdvoj\u00e1\u0159\u016f. \u010casto je ale hlavn\u00edm probl\u00e9mem nejasn\u00e1 specifikace na za\u010d\u00e1tku, kter\u00e1 se v pr\u016fb\u011bhu st\u00e1le upravuje a designe a architektura se pak neust\u00e1le p\u0159ed\u011bl\u00e1v\u00e1. V tom \u00fapln\u011b nejhor\u0161\u00edm p\u0159\u00edpad\u011b na konci m\u00e1te n\u011bco \u00fapln\u011b jin\u00e9ho, ne\u017e se zpo\u010d\u00e1tku myslelo.<\/p>\n<p>V t\u00e9to sekci se zam\u011b\u0159\u00edm na to jak v\u010das odhalit, \u017ee v\u00e1m v\u016fbec hroz\u00ed probl\u00e9m nedokon\u010den\u00ed v dan\u00e9m term\u00ednu. Za\u010dneme kvalitn\u00edm <a href=\"http:\/\/soch.cz\/blog\/management\/agile\/produkt-backlog-a-ohodnoceni-uloh\/\" title=\"Produkt Backlog\" >produkt backlogem<\/a>. Ten zdaleka nemus\u00ed b\u00fdt rozpracov\u00e1n do detail\u016f, ale mus\u00ed obsahovat v\u0161echny aktivity \u2013 Story \u2013 kter\u00e9 mus\u00ed b\u00fdt hotovy, aby byl se projekt mohl odevzdat. Nap\u0159. pro implementaci n\u011bjak\u00e9 funkcionality asi mus\u00edte ud\u011blat n\u00e1vrh, designe testu, implementaci, integraci, otestov\u00e1n\u00ed a napsat dokumentaci. Tyto highlevel Story ohodnot\u00edte body a v pr\u016fb\u011bhu projektu detailn\u011bji rozpracujete.<\/p>\n<p>T\u00fdm nechte pracovat v pravideln\u00fdch cyklech \u2013 Sprintech. Na konci ka\u017ed\u00e9ho Sprintu jednodu\u0161e ode\u010dtete body za ji\u017e hotov\u00e9 \u00falohy z celkov\u00e9ho backlogu. Porovn\u00e1n\u00edm hodnoty s pl\u00e1nem velice rychle vid\u00edte, jestli je v\u0161e v po\u0159\u00e1dku \u010di ne. Pou\u017eijete-li pro vizualizaci burndown graf, automaticky v\u00edte, jak jste na tom a to pravideln\u011b ka\u017ed\u00fd sprint. \u00dakolem sprintu je nau\u010dit t\u00fdm napl\u00e1novat to co opravdu zvl\u00e1dne a <i>odevzd\u00e1vat pravideln\u011b st\u00e1le stejn\u00fd objem pr\u00e1ce<\/i> a tak zv\u00fd\u0161it d\u016fv\u011bryhodnost odhad\u016f a spolehlivost data dokon\u010den\u00ed.<\/p>\n<p>Sprint by m\u011bl b\u00fdt kr\u00e1tk\u00fd, obecn\u011b by asi nem\u011bl b\u00fdt del\u0161\u00ed ne\u017e m\u011bs\u00edc. P\u0159i zav\u00e1d\u011bn\u00ed Agile a sprint\u016f se nebojte na za\u010d\u00e1tku zm\u011bnit d\u00e9lku sprintu, kdy\u017e se uk\u00e1\u017ee pro v\u00e1\u0161 projekt nevhodn\u00e1. N\u00e1m se nakonec osv\u011bd\u010dily 14 denn\u00ed sprinty. Za\u010d\u00ednali jsme s t\u00fddnem, ale to se uk\u00e1zala b\u00fdt moc kr\u00e1tk\u00e1 doba. Dobr\u00e1 pom\u016fcka je \u017ee mus\u00edte b\u00fdt za sprint schopni ukon\u010dit b\u011b\u017enou \u00falohu. Ale \u00falohy se daj\u00ed vcelku neomezen\u011b d\u011blit, tak\u017ee jde sp\u00ed\u0161 o to si to vyzkou\u0161et p\u0159\u00edmo ve Va\u0161em prost\u0159ed\u00ed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pod\u00edv\u00e1te-li se na software development projekty, dost \u010d\u00e1st se V\u00e1m stane, \u017ee nejsou dostate\u010dn\u011b dob\u0159e \u010dasov\u011b odhadnuty. Samoz\u0159ejm\u011b \u010d\u00e1ste\u010dn\u011b je to d\u00e1no \u0161patn\u00fdmi odhady v\u00fdvoj\u00e1\u0159\u016f. \u010casto je ale hlavn\u00edm probl\u00e9mem nejasn\u00e1 specifikace na za\u010d\u00e1tku, kter\u00e1 se v pr\u016fb\u011bhu st\u00e1le upravuje a designe a architektura se pak neust\u00e1le p\u0159ed\u011bl\u00e1v\u00e1. V tom \u00fapln\u011b nejhor\u0161\u00edm p\u0159\u00edpad\u011b na konci &hellip; <a href=\"https:\/\/soch.cz\/blog\/management\/agile\/scrum-management\/kratke-vyvojove-cykly-sprinty\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Kr\u00e1tk\u00e9 v\u00fdvojov\u00e9 cykly &#8211; Sprinty&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[12],"tags":[272,13,7,16,10],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/posts\/90"}],"collection":[{"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/comments?post=90"}],"version-history":[{"count":0,"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/posts\/90\/revisions"}],"wp:attachment":[{"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/media?parent=90"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/categories?post=90"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/soch.cz\/blog\/wp-json\/wp\/v2\/tags?post=90"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}